machine for processing PVC/UPVC window machine
Plastic steel machine refers to the processing machine used by door and window processing enterprises in the production of PVC/UPVC window machine. It consists of cutting machine, welding machine, corner cleaning machine, hand tools, etc.
machine introduction
A PVC/UPVC window processing enterprise with an annual output of 100000 square meters generally consists of the following machine:
Note 1. Factory building requirements: about 1500 square meters, the ground is hard and flat, and the width should be more than 20 meters; 2. Installed capacity: 50Kw/380V; 3. Air flow pressure: 7kg,
Air displacement: 1.5 m3/min; 4. The assembly scale of 100000 square meters is mainly restricted by the assembly process, so some machine is equipped with two sets to meet the production needs. The specific situation can be slightly adjusted downward according to the economic strength.
Required operators: (1) machine operation: 16 (2) Auxiliary personnel: According to the output demand (16-18)
After sales service editor broadcast
1、 Create one machine and one file [1]
1. Once each unit is sold or maintained, a computer file shall be established for it to record the customer’s address, telephone number, unit use, etc. in detail;
2. Warranty card shall be issued for qualified unit installation and commissioning;
3. Design technical maintenance specifications for each unit, including daily maintenance, first level technical maintenance, second level technical maintenance, third level technical maintenance and operation maintenance procedures, and track them regularly.
2、 Rapid and professional maintenance service team
Our after-sales service team is a technical elite team with many professional engineers, matching various advanced testing instruments, testing door and window machine and professional tools to provide customers with 24-hour service.
3、 The Company promises:
1. The machine will be repaired free of charge for one year and maintained for life.
2. For problems that cannot be solved by phone, technicians should rush to the site as soon as possible to troubleshoot for customers. Generally, maintenance should not exceed three days.
3. Provide lifelong service, and only charge material cost and reasonable labor cost beyond the warranty period.
Post time: Jan-04-2023